Metro has a plan
FOR A better drive on the I-10 Freeway
I-10EXPRESSLANES EXTENSION PROJECT
The PURPOSE of the Project is to increase efficiency, mobility, and connectivity by:
• Improving travel times increasing trip reliability, and maximizing vehicle and person throughout
• Promoting equitable and sustainable multi-modal travel options
• Addressing the gap between existing I-10 ExpressLanes and planned ExpressLanes facilities
• Providing interregional continuity and consistency throughout the region
The Project aims to address the following NEEDS:
• Degradation of travel speeds within certain segments of the I-10 HOV lanes, particularly east of SR 57 and around the I-10/I-605 interchange,
• Growing travel demands, delay times, and lower trip reliability during the peak commute periods, and
• The ExpressLanes gap between I-605 and LA/SB County line once the San Bernardino County Transportation Authority's I-10 ExpressLanes project is completed in 2024.